What else?

Technical field notes, mathematical musings, and interactive models about data, decisions, uncertainty, and the ideas that do not fit neatly anywhere else.

ARACHNE METHODS / SERIES INDEX

The Arachne methods series

02 / PUBLISHED

MEASUREMENT STANDARDS / SENSOR LIKELIHOODS / INTERACTIVE

The Number Is Not Enough

Compare technology-specific POD and quantification models, then see why a threshold and an accuracy claim cannot turn a vendor report into defensible evidence.

Read note →
03 / PLANNED

MARKED EPISODE PROCESSES / ANNUAL EMISSIONS / INTERACTIVE

What Is a Marked Episode Process?

Generate complete facility-year histories from episode onsets, durations, and rates, then integrate those hidden paths into exact annual totals.

In development
04 / PLANNED

REFERENCE MODEL / TRANSDIMENSIONAL INFERENCE / INTERACTIVE

Before You Make It Fast, Make It Right

Follow Arachne through inference over an unknown number of hidden episodes, then edit a variable-dimension state yourself.

In development
05 / PLANNED

ALIASING / IDENTIFIABILITY

Frequency, Duration, and the Information You Cannot Recover

Why sparse observations can reveal occupancy while leaving event frequency and duration fundamentally entangled.

In development
06 / PLANNED

PORTFOLIOS / AGGREGATION

One Model, Every Asset: From Facilities to Pipelines and Landfills

Why the same probabilistic accounting framework scales naturally across assets and up to a company-wide estimate.

In development
07 / PLANNED

INFORMATION VALUE / TECHNOLOGY COMPARISON

Which Sensor Teaches Us More?

How likelihoods and expected information gain let us compare monitoring technologies under the same emissions hypotheses and operating conditions.

In development
08 / PLANNED

TUTORIAL / END-TO-END INFERENCE

Using Arachne: From Evidence to an Annual Emissions Estimate

A worked example that starts with facility records and sensor models, then follows the calculation through posterior annual mass and sensitivity checks.

In development
09 / PLANNED

OPERATOR RECORDS / KNOWN EVENTS / INTERVENTIONS

Between the Measurements

How repairs, removals, operating-state changes, metered releases, and other records enter Arachne, including which capabilities are still planned.

In development

Browse Arachne methods →

MATHEMATICAL MUSINGS

Mathematical musings and other thoughts

Browse Mathematical Musings →